Installation & Erection
Site erection of structural steel, roof structures, and custom fabrications by our own rigging-certified crews, coordinated against your construction programme.
What This Service Covers
Fabrication is only half the job — our erection crews install what we build, or steel supplied by others, using mobile cranes, cherry pickers, and certified rigging equipment.
Erection sequencing is planned against your construction programme before steel leaves the workshop, so piece-marking, bolt-up sequence, and crane picks are all pre-planned rather than worked out on site.
All lifting and working-at-height operations run under a documented safety file, with a designated rigger and lift supervisor on every erection.
- Structural steel frame erection
- Roof structure & truss installation
- Mezzanine floor installation
- Staircase, balustrade & gate installation
- Steel supplied by others — erection only
| Crane capacity available | Up to 50 t mobile crane (subcontracted for larger lifts) |
| Rigging certification | Certified riggers & lift supervisors on every job |
| Safety compliance | OHS Act, working-at-height & lifting operation SOPs |
| Typical crew size | 4 – 8 erectors per site team |
| Programme integration | Erection sequenced to main contractor programme |
How We Deliver This
Every job runs through the same sequence — nothing skipped to hit a date.
Site & Access Survey
Crane positions, access routes, and lift plan confirmed before mobilisation.
Erection Sequencing
Bolt-up sequence and crane pick plan aligned to piece-marking from the shop.
Mobilisation
Crew, crane, and rigging equipment mobilised with a documented safety file.
Erection
Steel erected and temporarily braced under supervision of a certified rigger.
Final Alignment & Sign-off
Plumb, level, and bolt torque checked and signed off against the erection drawing.
Related Projects
Alrode Distribution Warehouse
Full portal frame structure and mezzanine platform for a 9,000 m² logistics warehouse, fabricated and erected in 11 weeks.
Highveld Processing Plant Conveyor Gantry
Elevated conveyor gantry and transfer tower structure fabricated for a mineral processing plant, installed during a planned shutdown window.
Sunridge Mezzanine Office Platform
Structural mezzanine platform inserted into an existing warehouse to create additional office and storage space without extending the building footprint.
Installation — Frequently Asked
Yes — we regularly erect steel supplied by other fabricators. We'll review the piece-marking and drawings beforehand to confirm the erection sequence.
Ready to spec your next project?
Send us your drawings, dimensions, or just a description of what you need — we'll come back with a scoped quote and realistic timeline.