Steel We've Cut, Welded & Erected
A filtered sample of completed projects — each with the specs, the challenge, and how we solved it. Full documentation available on request for similar scopes.
Alrode Distribution Warehouse
Full portal frame structure and mezzanine platform for a 9,000 m² logistics warehouse, fabricated and erected in 11 weeks.
Van Wyk Grain Storage Facility
Clear-span grain storage structure and silo support steel, fully hot-dip galvanized for a 25-year exposed-environment lifespan.
Formwork Interiors Retail Fit-Out
Feature staircase, mezzanine balustrade, and brushed stainless signage frame for a flagship retail fit-out.
Riverstone Estate Security Upgrade
Custom-fabricated automated security gates and perimeter burglar-proofing for a residential estate, matched to architectural finishes.
Highveld Processing Plant Conveyor Gantry
Elevated conveyor gantry and transfer tower structure fabricated for a mineral processing plant, installed during a planned shutdown window.
Sunridge Mezzanine Office Platform
Structural mezzanine platform inserted into an existing warehouse to create additional office and storage space without extending the building footprint.
Ready to spec your next project?
Send us your drawings, dimensions, or just a description of what you need — we'll come back with a scoped quote and realistic timeline.